Contact Us Quality Health & Safety Environment Investor Information Converting Technical Fibre Products The Paper Mill Shop Home Speciality Papers Links Company History

ANNUAL REPORT

EXTRACT FROM 2007 ANNUAL REPORT

For many decades approximately 1 million gallons (4,545 cubic metres) of papermaking effluent were discharged each day into settlement lagoons on the Group’s Burneside site. Within the lagoons the effluent underwent primary settlement.

This process separated out solid material, "sludge", whilst liquids were pumped to United Utilities’ Kendal Wastewater Treatment Works for further treatment before being discharged
into the River Kent. The primary settlement process yielded approximately 10,000 tonnes of "sludge" per annum, of which the water content was 85%. The operation necessitated the alternative use of two primary settlement lagoons, each being emptied every 6 to 8 weeks once full. On removal from the lagoons "sludge" was deposited in the Group’s landfill site.

 

Download PDF version of the complete
Annual Results for the year ending 31st March 2007 (1450Kb)
This file can be read using the Adobe Acrobat® Reader. If you haven't already got this then you can download it from the Adobe website by clicking on the link below.
 
Health and Safety Annual ReportAdobe® Acrobat® Reader™ is free, and freely distributable, software that lets you view and print Adobe Portable Document Format (PDF) files. Note: You will receive the most recent version of Acrobat Reader that is available for your language and platform.

 

Local Community

Pollution

Forestry Management

ISO14001

Environment Matters

2006/07 Annual Report

 
Back to Top Home Site Map
Copyright © 2001 James Cropper plc
Terms of Use | Site by Cypher